July 21, 2020 By admin Off

Time for a new HVAC system

My church needed to have the Heating in addition to Air Conditioning system one hundred percent substituted in addition to since everything was closed down because of the pandemic shutdowns, the two of us decided that it was a good time to get it done.

I have been pushing to have our heating and cooling system redone for years, however it just kept on getting pushed back a few days, and people wanted to do other things with the money that the church had saved, which makes total sense.

I mean, I’m also a guy who likes to help the awful and extremely underprivileged population. However, I am also a guy who suffers greatly from seasonal allergies and I really was hoping that they would do something to get the heating in addition to the cooling system at the church in a more durable shape. I found that every time I would go into the building, I would have all kinds of respiratory problems. It was a little bit sporadic, too. I noticed that it was the worst whenever the heating or the a/c would come on in addition to start blowing air from the air ducts. I figured that it was some sort of mold or dust that had accumulated up in the ventilation ducts. I am beyond happy that the commercial Heating in addition to the Air Conditioning company is going to be totally redoing the ventilation system at the holy ground, along with installing a totally modern central cooling system in addition to the gas oil furnace. I suppose it will be a good thing for the church and for me as well! I think that having the whole Heating in addition to the Air Conditioning system redone is a single good thing about all of the pandemic shutdowns.

 

a/c serviceman